DWR is committed to creating an inclusive digital environment. As we strive to fully implement WCAG 2.1, if you encounter any accessibility issues or require any assistance, please alert us so we can determine a reasonable accommodation. Please see our Accessibility page for contact information.
Permit Number --- 5410
Permit Information
Permit Holder: O'TOOLE, PAUL AND SHARON Priority Date: 2000-03-10
Use Type: Irrigation
CRYSTAL, ND

Status Code: Perfected
Requested Acre-Feet: 180 Approved Acre-Feet: 80
Requested Acres: 118 Approved Acres: 80
Requested Rate: 1500 Approved Rate: 800
Requested Storage: 0 Approved Storage: 0


The Approved Acre-Feet, Acres, Rate, and Storage listed for the Permit may differ from the combined totals presented with the Points of Diversion. The totals that are presented with the Point of Diversion represent the maximum that can be withdrawn at that point. However, the withdrawals from all of the Points of Diversion are still not to exceed the totals allocated for the Permit.


Point of Diversion Information
15805633C
Beneficial Use Date 2004-06-01
County Walsh
Basin Park
Aquifer Edinburg
Status Active
Source Ground Water
Req. Acre Feet 180
Req. Acres 118
Req. Pumping Rate 1500
Req. Storage 0
App. Acre Feet 80
App. Acres 80
App. Pumping Rate 800
App. Storage 0
Reported Water Use
Year Acre Feet Acres Rate
2025 54.66 80 891
2024 18.06 66 0
2023 19.94 80 891
2022 29.99 80 891
2021 62.39 66 0
2020 27.46 66 891
2019 30.39 65 891
2018 63.2 65 891
2017 20.38 65 891
2016 10.7 80 0
2015 26.7 80 0
2014 11.1 0 0
2013 61.2 102 800
2012 30.9 102 0
2011 82 102 0
2010 1.3 0 0
2009 0 0 0
2008 60 102 800
2007 42.1 78 800
2006 76 78 800
2005 21.1 78 0
2004 65.1 102 0
2003 84.7 78 800
2002 58.1 70 700
2001 0 0 0