DWR is committed to creating an inclusive digital environment. As we strive to fully implement WCAG 2.1, if you encounter any accessibility issues or require any assistance, please alert us so we can determine a reasonable accommodation. Please see our Accessibility page for contact information.
Permit Number --- 7023
Permit Information
Permit Holder: DENBURY RESOURCES Priority Date: 2018-09-13
Use Type: Industrial
PLANO, TX

Status Code: Conditionally Approved
Requested Acre-Feet: 1585.5 Approved Acre-Feet: 1585.5
Requested Acres: 0 Approved Acres: 0
Requested Rate: 983 Approved Rate: 983
Requested Storage: 0 Approved Storage: 0


The Approved Acre-Feet, Acres, Rate, and Storage listed for the Permit may differ from the combined totals presented with the Points of Diversion. The totals that are presented with the Point of Diversion represent the maximum that can be withdrawn at that point. However, the withdrawals from all of the Points of Diversion are still not to exceed the totals allocated for the Permit.


Point of Diversion Information
13110527B
Beneficial Use Date 2025-02-01
County Bowman
Basin Upper Little Missouri
Aquifer Lodgepole
Status Active
Source Ground Water
Req. Acre Feet 1585.5
Req. Acres 0
Req. Pumping Rate 983
Req. Storage 0
App. Acre Feet 1585.5
App. Acres 0
App. Pumping Rate 983
App. Storage 0
Reported Water Use
Year Acre Feet Acres Rate
2025 272.92 0 169.1
2024 280.47 0 173.88
2023 417.6 0 258.8
2022 341.66 0 211.24
2021 341.7 0 211
2020 287.56 0 177.77
2019 123.05 0 76