DWR is committed to creating an inclusive digital environment. As we strive to fully implement WCAG 2.1, if you encounter any accessibility issues or require any assistance, please alert us so we can determine a reasonable accommodation. Please see our Accessibility page for contact information.
Permit Number --- 6596
Permit Information
Permit Holder: ARMSTRONG OPERATING, INC. Priority Date: 2013-10-10
Use Type: Industrial
DICKINSON, ND

Status Code: Perfected
Requested Acre-Feet: 470 Approved Acre-Feet: 68
Requested Acres: 0 Approved Acres: 0
Requested Rate: 300 Approved Rate: 50
Requested Storage: 0 Approved Storage: 0


The Approved Acre-Feet, Acres, Rate, and Storage listed for the Permit may differ from the combined totals presented with the Points of Diversion. The totals that are presented with the Point of Diversion represent the maximum that can be withdrawn at that point. However, the withdrawals from all of the Points of Diversion are still not to exceed the totals allocated for the Permit.


Point of Diversion Information
13909617B
Beneficial Use Date 2024-03-17
County Stark
Basin Upper Heart
Aquifer Dakota Group
Status Active
Source Ground Water
Req. Acre Feet 470
Req. Acres 0
Req. Pumping Rate 300
Req. Storage 0
App. Acre Feet 68
App. Acres 0
App. Pumping Rate 50
App. Storage 0
Reported Water Use
Year Acre Feet Acres Rate
2025 33.42 0 0
2024 37.51 0 23
2023 35.9 0 23.3
2022 39.02 0 23
2021 41.2 0 43.78
2020 41.84 0 361.55
2019 26.3 0 16.4
2018 35.9 0 22
2017 29.15 0 18
2016 16.66 0 15
2015 23.7 0 15.2
2014 6.6 0 15