DWR is committed to creating an inclusive digital environment. As we strive to fully implement WCAG 2.1, if you encounter any accessibility issues or require any assistance, please alert us so we can determine a reasonable accommodation. Please see our Accessibility page for contact information.
Permit Number --- 6363
Permit Information
Permit Holder: BENZ-HENDRICKSON Priority Date: 2012-01-17
Use Type: Industrial
DUNN CENTER, ND

Status Code: Conditionally Approved
Requested Acre-Feet: 75 Approved Acre-Feet: 75
Requested Acres: 0 Approved Acres: 0
Requested Rate: 150 Approved Rate: 2750
Requested Storage: 0 Approved Storage: 0


The Approved Acre-Feet, Acres, Rate, and Storage listed for the Permit may differ from the combined totals presented with the Points of Diversion. The totals that are presented with the Point of Diversion represent the maximum that can be withdrawn at that point. However, the withdrawals from all of the Points of Diversion are still not to exceed the totals allocated for the Permit.


Point of Diversion Information
14509330DA
Beneficial Use Date 2028-02-01
County Dunn
Basin Knife
Aquifer
Status Active
Source Surface Water
Req. Acre Feet 75
Req. Acres 0
Req. Pumping Rate 150
Req. Storage 0
App. Acre Feet 75
App. Acres 0
App. Pumping Rate 2750
App. Storage 0
Reported Water Use
Year Acre Feet Acres Rate
2025 0 0 0